Skip to main content

Item Conversion Mapping Specification

 

 

Item Conversion Mapping Specification

 

 

              

Item Data Conversion

 

 

 

 

 

 

Author:                                  

Creation Date:                     29th August 2023

Last Updated:                      30th August 2023

Document Ref:                   

Version:                                 0.1

Change Record

2

Date

Author

Version

Change Reference

30-Aug-23


1.1

 

 

 

 

 

 

 

 

 

 

 

Name

Position



 

 

 

 

 

 

Name

Position



 

 

 

 

 

 

 

Contents

Document Control....................................................................................... 2

Change Record................................................................................................................... 2

Reviewers........................................................................................................................... 2

Approvers........................................................................................................................... 2

Introduction............................................................................................... 4

Conversion Scope, Strategy And Assumptions............................................................... 4

Prerequisites...................................................................................................................... 4

Oracle FUSION ITEM TEMPLATE Lookup Field MAPPING.................................... 5

MAPPING SPECIFICATIONS......................................................................... 11

Data Extract Component Logic.................................................................... 12

Data Extraction Rules...................................................................................................... 12

Upload Component Logic........................................................................... 13

Data Flow Assumptions/ Prerequisites......................................................................... 13

Open and Closed Issues.............................................................................. 14

Open Issues...................................................................................................................... 14

Closed Issues................................................................................................................... 14


The purpose of this document is to document and communicate the configurations, data mapping, interdependency and component design specifications for the conversion of an individual entity that is going to be converted to the Oracle Cloud applications.

Following Objects will be converted:

Item

Conversion Scope, Strategy And Assumptions

The Conversion Component FBDI template is used by the Technical team as the basis for the design and construction of the Item conversion.

High Level Conversion Process Overview- Item

a.      The Data Migration of Oracle Item data will involve conversion of data from CLIENT’s old legacy system into CLIENT’s new Oracle Fusion.

b.      The data being migrated from CLIENT’s old system into new system will be transformed because the source and target data structures are different.

c.      The data extract provided from legacy system will be used to build the FBDI templates with Metadata of Item

 

Following configurations are required in SaaS

S.no

Task Name

Status

Comments

01.

Enterprise Design Setup

Completed

 

02.

Item Class

Completed

 

03.

UOM Setup

Completed

 

04.

Item Templates and Item Type

Completed

 

05.

Item Status

Completed

 

06.

Item Lifecycle Phases

Completed

 

07.

Item Catalog and Category Setup

Open

 

08.

Item Attribute

Open

 

 

Field Name = Make or Buy

Value

Description

 1

 Make

 2

Buy

Field Name = Reservable

Value

Description

 1

 create material reservations for the item

 2

 don't create material reservations for the item

Field Name = Structure Item Type

Value

Description

 1

 Model

 2

Option Class

 3

Planning

 4

 Standard

 5

Product Family

Field Name = Forecast Control

Value

Description

 1

 Consume Forecast

 2

Consume and Derive Forecast

 3

 None

 4

Consume then Explode

 5

Explode then Consume

Field Name = Planning Method

Value

Description

 10

Replenishment Planning

 3

 MRP Planning

 4

 MPS Planning

 6

 Not Planned

 7

 MRP and MPP Planning

 

Field Name = Round Order Quantities

Value

Description

 1

 round the quantity on an internal requisition when converting between the unit of measure on the requisition line and the item on the unit of issue

 2

 don't resolve the unit of issue to an integer. Setting this attribute to 2 might result in a fractional amount.

 

 

Field Name = User Item Type

Value

Description

AA

Asset Activity

AG

Asset Group

AI

ATO Item

AOC

ATO Option Class

ATOFG

ATO Model - Manufactured

ATOP

ATO Model - Purchased

CMFG

Contract Manufacturing Finished Goods

CMSC

Contract Manufacturing Service Component

CONSULTING

Contracts for Consulting

CTO

Configured Item

EDU

Contracts for Education

EQ

Equipment

FG

Finished Good

FRT

Freight

I

Inventory type

K

Kit

KIT

Contracts for Kit

M

Model

MEDIA

Contracts for media

NRI

Nonrecurring item

NS

Nonstock item

OC

Option Class

OP

Outside processing Item

P

Purchased Item

PF

Product family

PH

Phantom Item

PL

Planning

POC

PTO Option Class

PTO

PTO Model

RB

Rebuildable

REF

Reference Item

RI

Recurring item

SA

Subassembly

SI

Supply Item

SW LIC

Contracts for Software License

TRAIN

Contracts for Training

 


Field Name = Pricing Unit of Measure

Value

Description

 P

 Primary

 S

 Secondary

 

 

Field Name = WIP Supply Type

Value

Description

 1

 Push

 2

 Assembly pull

 3

Operation pull

 4

Bulk

 5

 Supplier

 

 

 

 

 

 

 

Field Name = Inventory Planning Method

Value

Description

 1

Reorder Point planning

 2

 Min-max Planning

 6

 Not Planned

 7

Supplier Managed

Field Name = Replenishment Source Type

Value

Description

 1

 Inventory

 2

 Supplier

 3

Subinventory 

 

Field Name = Sub inventory Restrictions

Value

Description

 1

 then restrict the transactions of the item from the sub inventory

 2

 don't restrict the transactions of the item from the sub inventory. The default value is true.

 

Field Name = Restrict Locators

Value

Description

 1

restrict the transactions of the item from the locator

 2

then don't restrict the transactions of the item from the locator.

Field Name = Lot Expiration Control

Value

Description

 1

 No Control

 2

Shelf life days

 4

 User-defined

 

 

 

 

 

Field Name = Serial Number Control

Value

Description

 1

 No serial number control

 2

Predefined serial number

 5

 Dynamic entry at inventory receipt

 6

 Entry at sales order, transfer order or work order issue

 7

Entry at inventory pick

Field Name = Revision Control

Value

Description

 1

 the item isn't under revision control and it includes inventory attributes.

 2

 the item is under revision control and it includes inventory attributes

Field Name = Stock Locator Control

Value

Description

 1

No control

 2

Previously specified

 3

Dynamic Entry

Field Name = Lot Control

Value

Description

 1

 No Control

 2

 Full Control

 

Field Name = Reservable

Value

Description

 1

create material reservations for the item

 2

don't create material reservations for the item.

 

 

 

 

Field Name = Structure Item Type

Value

Description

 1

 Model

 2

Option Class

 3

 Planning

 4

 Standard

 5

 Product Family

Field Name = Forecast Control

Value

Description

 1

Consume Forecast

 2

Consume and Derive Forecast

 3

 None

 4

Consume then Explode

 5

 Explode then Consume

Field Name = Demand Time Fence

 Value

 Description

1

Cumulative Total Lead Time

2

Cumulative Manufacturing Lead Time

3

Item Total Lead Time

4

User Defined Time Fence

Field Name = Planning Method

Value

Description

 10

Replenishment Planning

 3

 MRP Planning

 4

 MPS Planning

 6

 Not Planned

 7

 MRP and MPP Planning

 

 

 

 

 

Field Name = Planning Time Fence Code

 Value

 

 Description

1

 

Cumulative Total Lead Time

2

 

Cumulative Manufacturing Lead Time

3

 

Item Total Lead Time

4

 

User Defined Time Fence

Field Name = Round Order Quantities

Value

Description

 1

round the quantity on an internal requisition when converting between the unit of measure on the requisition line and the item on the unit of issue

 2

then don't resolve the unit of issue to an integer. Setting this attribute to 2 might result in a fractional amount.

Field Name = RMA Inspection Required

Value

Description

 1

then inspection is needed for items returned by customers. The item then must be transferred to inventory separately

 2

Inspection isn't needed for items returned by customers.

Field Name = Receipt Routing

Value

Description

 1

Standard

 2

Inspection

3

Direct


 

 

Item Additional Attributes

GLOBAL

NAME

TABLE COLUMN

VALUE SET

GLOBAL(Y/N)

WIP ACCOUNT CLASS

ATTRIBUTE1

CUIN_ITM_WIP_ACCT_CLASS

Y

COUNTRY OF ORIGIN

ATTRIBUTE4

CUIN_ITM_COUNTRY_CODE

Y

END OF LIFE DATE

ATTRIBUTE_DATE1

AS_SRS_DATE.

Y

CONTEXT- 0333 VJ IT INV ORG (ORGANIZATION SPECIFIC)

COUNTRY OF ORIGIN _2

ATTRIBUTE2

CUIN_ITM_COUNTRY_CODE

N

NRTL ITEM

ATTRIBUTE3

INV_SRS_YES_NO

N

MFG INSTRUCTION

ATTRIBUTE5

150 Character

N

HOT PART

ATTRIBUTE6

Yes_No

N

COMMENTS

ATTRIBUTE7

240 Character

N

ECCN NUMBER

ATTRIBUTE8

ECCN _NUMBER

N

MEU NUMBER

ATTRIBUTE9

MEU_NUMBER

N

TARIFF CODE

ATTRIBUTE10

TARIFF_CODE

N

NET WEIGHT

ATTRIBUTE11

NET_WEIGHT

N


 

Navision/ebs to fusion data field mapping

Data conversion process involves mapping of source and destination columns which is the critical part of entire conversion process. As discussed on Items conversion with Videojet IT and Business, mapping of the columns will be provided along with data in standard FBDI template.

 

 

Sample Data provided by Videojet Team in FBDI template

 

 

Fusion Navigations:

 

Item screen: Product Management -> Product Information Management -> Manage Items/Browse items

 

Run a ESS job: Tools -> Scheduled Processes -> Schedule New Process

 

Standard ESS Jobs used in Item Conversion:

 

1.      Load Interface File for Import

2.      Item Import

3.      Purge Interface Tables

 

 

Note:Describe the component logic for the download component(s) used to convert the entity being converted.

Bring Item and related details from existing legacy system to New Fusion

 

To bring in Item Data into Oracle fusion we need pre-requisites of UOM Setups, Item Status, Item Lifecycle Phases, into Oracle Fusion. These will be loaded as part of separate conversions.

 

Pool: Only Include Active Item Data

 

 

Data Extraction Rules

 

S.no

Business Rules

01.

All the Items currently available in Navision will get converted and get associated to child org

02.

All the Items will get associated to Root Item Class in Oracle Fusion (Any change to the same will be communicated by Business)

04.

There are 6 Item Statuses available for an Item and association will happen based on the extraction.

05.

All the Additional Attribute associated with the Item should be part of the Item Conversion.

06.

All the Item created should be Auto Approved

07.

While creating the Item Technical Team to use Single “Created By” Name, this will help business to reconcile if Item is created Manually or through Conversion.

 


conversion approach

Note:        Describe the component logic for the upload component(s) used to convert the entity being converted.

·        Extract the data and populate it in Oracle FBDI Template.

·        Validate the Data and manually change any data as required and generate .CSV and .ZIP file from template

·        Goto Scheduled Processes in Fusion and First Run ‘Load Interface File for Import’ for ‘Item Import’ and upload the .zip file. After its Successful Completion rerun the Item Import Program to transfer the data from Interface Table to Base Table.

·        Review output log for successfully migrated records and exceptions. Correct errors and reload errored records.

·        If errored data is to be deleted from Interface table, run the job ‘Purge Interface Tables’

·        Repeat the Process until all the records are imported successfully.

·        Validate the data if all columns are correctly populated.

 

 

 

Data Flow Assumptions/ Prerequisites

The development specifications for Item data assume the following:

Key Assumptions are:

·        The data of Item data will be provided by the CLIENT extraction team directly into FBDI template.

·        Oracle technical team will generate the data in the required CSV and ZIP format.

·        FBDI template will be build based on data extracts provided from Navision or EBS.

·        All required setups/configurations have been completed before the program is run.

ü  UOM Conversion

ü  Item Status

ü  Item Lifecycle Phase

 

 

ID

Issue

Resolution

Responsibility

Target Date

Impact Date

1

Attribute values are missing

Recheck attributes configured

Context is inv org


 

 

 

2

 

 

 

 

 

3.

 

 

 

 

 

4

 

 

 

 

 

 

ID

Issue

Resolution

Responsibility

Target Date

Impact Date

1

Attribute values are missingRecheck attributes configured

Context is inv org


 

 

 

2

 

 

 

 

 

3.

 

 

 

 

 

4

 

 

 

 

 

 

 

 


 

Comments

Popular posts from this blog

Finance All Modules Process Flows

  To- Be Process Flow General Ledger Manual Journal Approval Process Flow Journal Management Invoice Process Flow for Equipment Orders Payment Receiving Through Lock Box Process Flow Collections Overview Process Flow Process Flow to Handle Delinquent Customer Collections Process Flow Payable Invoice (PO Matched) workflow process   Payable Invoice (Non PO Matched) Workflow Process Payment Batch Process  IDR Process Flow To-Be Process Flow Bank Reconciliation - Payment Payables to Fixed Assets Flow Process Flow - Transfer Assets Process Flow –Reclassification (Change Category) Process Flow – Retire Asset Process Flow – Reinstate Asset Process Flow – Impairment Process flow- Depreciate Assets CORP Book to Tax Book TO-Be Process Flow – General Ledger Manual Journal Approval Process Flow   Journal Management  

Finance All Modules Process Flows

  To- Be Process Flow General Ledger Manual Journal Approval Process Flow Journal Management Invoice Process Flow for Equipment Orders Payment Receiving Through Lock Box Process Flow Collections Overview Process Flow Process Flow to Handle Delinquent Customer Collections Process Flow Payable Invoice (PO Matched) workflow process   Payable Invoice (Non PO Matched) Workflow Process Payment Batch Process  IDR Process Flow To-Be Process Flow Bank Reconciliation - Payment Payables to Fixed Assets Flow Process Flow - Transfer Assets Process Flow –Reclassification (Change Category) Process Flow – Retire Asset Process Flow – Reinstate Asset Process Flow – Impairment Process flow- Depreciate Assets CORP Book to Tax Book TO-Be Process Flow – General Ledger Manual Journal Approval Process Flow   Journal Management  

Finance All Modules Process Flows

  To- Be Process Flow General Ledger Manual Journal Approval Process Flow Journal Management Invoice Process Flow for Equipment Orders Payment Receiving Through Lock Box Process Flow Collections Overview Process Flow Process Flow to Handle Delinquent Customer Collections Process Flow Payable Invoice (PO Matched) workflow process   Payable Invoice (Non PO Matched) Workflow Process Payment Batch Process  IDR Process Flow To-Be Process Flow Bank Reconciliation - Payment Payables to Fixed Assets Flow Process Flow - Transfer Assets Process Flow –Reclassification (Change Category) Process Flow – Retire Asset Process Flow – Reinstate Asset Process Flow – Impairment Process flow- Depreciate Assets CORP Book to Tax Book TO-Be Process Flow – General Ledger Manual Journal Approval Process Flow   Journal Management